Gas and Irrigation Permit Fees

Gas Permit Fees
Permit fee will be based on fee schedule, valuation of project or number of required inspections (whichever is greater).

Note: Any project (except 1 & 2 Family Dwelling Units) costing $100,000.00 or over, the contract price will be used to calculate the fee.
Processing Fee $10.00
Repairs $30.00
Natural Gas Piping System (up to 4 outlets) $30.00
Additional Natural Gas Outlets $8.00 each
Propane Tank Inspection $30.00
Annual Gas Test $30.00
Gas Water Heater $30.00
Gas Appliance(s) $30.00
Inspection Only $30.00 each
1st re-inspection
2nd re-inspection
3rd re-inspection

Must be registered with the Texas Railroad Commission for repair installation of LP Gas Systems.

Irrigation Permit Fees
Description Fee
Processing Fee $10.00
Plan Review Fee $25.00
New Irrigation Installation with Backflow $140.00
Backflow Device $30.00